Test Preparation

ENAV Air Traffic Controller Selection: Requirements, FEAST 1 and FEAST 2

Train with Preparation Software for FEAST

Both of ENAV's test phases are FEAST. Practise FEAST-style tasks in the FEAST Preparation Suite, or start with the free FEAST practice test. The tasks are original practice, not the official test.

Start preparing now

ENAV does not run a standing recruitment for air traffic controllers. It opens a selection when it needs new controllers, sets the requirements for that call, and closes it again after a short window. The most recent call we could find on ENAV's site accepted applications for ten days in January 2025. This guide explains how that selection worked, based on ENAV's job posting and its careers FAQ, both read on 25 November 2026. The next call may set different rules.

A blue ITA Airways Airbus narrow-body airliner on a runway, seen from the side.

Photo: Drinu Cutajar / Pexels

Who ENAV is and why its selection matters

ENAV S.p.A. provides civil air navigation services in Italy. In the January 2025 posting it described a group of more than 4,000 people working from 45 control towers and four area control centres, and said it is the only company in Italy authorised to select, train and update the professional profiles that work in civil air traffic control. In practice, if you want to control civil traffic in Italy, this is the selection you need to pass.

The company's FAQ is direct about timing. There is no fixed schedule for controller selections, and a new call is published only when the business needs more trainees. Requirements, including the level of English, are set each time.

ENAV controller requirements in the 2025 call

  • born on or after 1 January 1997;
  • an upper secondary school diploma;
  • English at ICAO level 4 or CEFR B2;
  • Italian at ICAO level 5 or CEFR C1.

Candidates without EU citizenship needed a valid residence permit for the whole training period and the employment that follows. Permanent employees of the ENAV Group could not take part. The medical standards are not set by ENAV: its FAQ points to the regulation published by ENAC, Italy's civil aviation authority.

Applications ran from 15:00 on 7 January 2025 to 15:00 on 17 January 2025, Italian time, through an online form. With it you uploaded your diploma showing the final grade and the school's signature or stamp, a valid identity document and a CV. A diploma issued abroad needed a declaration of equivalence with a grade expressed out of 100. ENAV accepted no other channel.

The five steps of the ENAV selection

StepStageWhat happens
1ApplicationOnline application form with diploma, identity document and CV uploaded
2Application screeningDeclared requirements checked against the job posting
3Document screeningUploaded documents checked; diploma grade may decide invitations if more than 3,000 applications qualify
4Phase one: FEAST 1In person, in English: cognitive abilities and English language knowledge
5Phase two: FEAST 2In person, in English: practical simulation tests

Each step had to be passed before the next, and the testing took place in Rome. The company Gi Group handled the application and document checks. EUROCONTROL ran both FEAST phases.

One detail in step three is easy to miss. If more than 3,000 applications met the requirements, ENAV said it could use the secondary school diploma grade as an extra filter for invitations to FEAST 1. A strong diploma grade could therefore matter before you sit a single test.

FEAST 1 and FEAST 2 at ENAV

FEAST is the First European Air Traffic Controller Selection Test, designed by EUROCONTROL. ENAV's posting said it is used in 56 countries and has been taken by more than 150,000 candidates.

FEAST 1, the first phase, is a set of computer-based tests in English that measure cognitive abilities and English language knowledge. FEAST 2 follows only for those who pass. ENAV describes it as practical simulation tests, also in English, that measure how well a candidate fits the performance required on the job.

ENAV does not publish which individual FEAST tests it uses. EUROCONTROL's FEAST training FAQ says each recruiting organisation chooses either a subset or the full set. Our guide to what to expect in FEAST covers the test family, and the guide on preparing for FEAST 2 covers the simulation stage.

What happens after you pass

Passing both phases did not mean an immediate training place in 2025. Successful candidates went into a pool, and ENAV could call them to training up to 31 December 2028 according to its needs, after the required medical check if they did not already hold a valid one.

According to the FAQ, the course lasts about one year at ENAV's Training Centre in Forlì, with assessments along the way and a final exam. Trainees then move to one of ENAV's operational units for on-the-job training, which ends with a last assessment. The posting says those who complete training are offered a permanent contract at sites across Italy, so you should not expect to choose your unit.

For how this compares with other European providers, see our overview of air traffic controller initial training in Europe.

How to prepare for the next ENAV call

The windows have been short, so do the slow work before a call opens. Get an English certificate at B2 or higher if you do not have one, and keep your diploma, with its grade, ready to upload. If your diploma is from another country, start on the equivalence declaration early.

FEAST 1 is taken in English, so practise reading test instructions in English under time pressure as well as the tasks themselves. EUROCONTROL runs a free FEAST training platform. Its FAQ says it covers almost all FEAST I tests but not FEAST II, and that it is the only practice material EUROCONTROL authorises. Our free FEAST training guide explains the options, and the FEAST Preparation Suite adds timed practice tasks written by ATC Preparation, not by EUROCONTROL.

Watch ENAV's open positions page, where the company says it publishes dates and test locations for each selection.

Official sources

All pages checked on 25 November 2026.

Previous PostHomeNext Post